Circuit upgrade for a multi-head split system
A Balmain East home adding a second indoor head to their multi-head system needed extra circuit capacity. We assessed the existing board, upgraded the circuit rating and confirmed both heads ran without tripping. Most of the housing on this side of Balmain East is heritage terrace houses, so we planned cable routes and fixing points around that before touching a tool. Jobs like this between Illoura Reserve and Peacock Point are part of our regular Balmain East run, so callouts here rarely wait long.












