Electrical emergency right now?
RECENT JOBS · SYDNEY

Sydney electrician case studies Real jobs, real outcomes

A snapshot of recent completed jobs across the Inner West and Canterbury-Bankstown — switchboards, EV chargers, LED relights, smoke alarms, hot water, data & TV and commercial fit-outs. Anonymised, but the work is real.

NSW LICENSED|FULLY INSURED|LIFETIME WARRANTY

Licensed & Insured
5★ Google Reviews
Fast Sydney Response

Get an emergency Sydney electrician on the way

Free phone advice · Clear pricing provided before any repair work proceeds

24/7 callout · Real Sydney electrician, not a call centre

Or call now: 0468 404 608 · Available 24/7

Switchboard Upgrades

Ceramic-fuse board swap on a 1970s brick veneer

Homeowner in Strathfield had breakers tripping every time the kettle and toaster ran together. We pulled the old board, installed a modern enclosure with individual RCBOs on every circuit and re-terminated the tails.

Outcome

New compliant board, CCEW issued, zero tripping since.

Approx. 5.7 hours on site

More on Switchboard Upgrades
Switchboard Upgrades

Meter box relocation for a heritage terrace

A terrace in Strathfield South had a warped, weather-damaged meter box on the front facade. We coordinated the Ausgrid outage, relocated the meter, upgraded the board and weatherproofed the new enclosure.

Outcome

Meter moved, board upgraded, heritage frontage preserved.

Approx. 8 hours on site

More on Switchboard Upgrades
LED Downlights & Lighting

Whole-home halogen swap in a Federation home

Owner in Homebush wanted 28 halogens replaced with dimmable LEDs before summer. We spec'd matched trailing-edge dimmers, swapped fittings room-by-room and left clean plaster cut-outs.

Outcome

28 LEDs installed, ~90% lighting energy saved, no flicker.

Approx. 5 hours on site

More on LED Downlights & Lighting
LED Downlights & Lighting

Kitchen relight for a mid-century renovation

Kitchen renovation in Homebush West needed even task lighting over the island plus dimmable ambient. We laid out fittings on a 1.4 m² grid, installed pendants over the bench and wired a two-scene dimmer.

Outcome

Bright, even lighting, two dim scenes, no shadow zones.

Approx. 3.7 hours on site

More on LED Downlights & Lighting
EV Charger Installation

Tesla Wall Connector on a single-phase supply

New Tesla owner in Burwood needed a home charger. We ran a dedicated 32 A RCBO circuit from the switchboard, mounted the Wall Connector in the garage and configured load balancing so the main never trips.

Outcome

7 kW home charging, CCEW issued, ~40 km range per hour.

Approx. 4.3 hours on site

More on EV Charger Installation
EV Charger Installation

Solar-diverting Zappi install

Homeowner in Croydon with a 6.6 kW rooftop array wanted to charge only from excess solar. We wired a Zappi charger, added the CT clamp on the mains, and configured Eco+ mode so the car sips only spare PV.

Outcome

Free daytime charging from surplus solar, app-managed schedules.

Approx. 5 hours on site

More on EV Charger Installation
Ceiling Fans

Bedroom ceiling fan with wall control

Family in Croydon Park needed a quiet fan in the main bedroom. We removed the existing rose, installed a DC fan on a rated bracket and wired a dedicated wall controller — no pull-cord dangling.

Outcome

DC fan installed, 6-speed wall control, near-silent running.

Approx. 1.5 hours on site

More on Ceiling Fans
Ceiling Fans

Outdoor alfresco fan on a covered deck

Alfresco area in Concord needed an outdoor-rated fan over the dining table. We ran a new outlet from a nearby circuit, sealed the ceiling penetration and installed an IP-rated fan with remote.

Outcome

Weatherproof fan, remote control, ready for summer.

Approx. 2.5 hours on site

More on Ceiling Fans
Smoke Alarms

Interconnected 10-year alarm upgrade

Investment property in Concord West needed compliant interconnected alarms across three levels. We replaced ageing 9 V units with hard-wired 10-year lithium alarms interconnected via wireless mesh.

Outcome

AS 3786-compliant coverage, one alarm triggers all, ready for lease.

Approx. 2.7 hours on site

More on Smoke Alarms
Smoke Alarms

Hard-wired alarms after renovation

Extension in North Strathfield needed alarms tied to the new circuits. We hard-wired 240 V photoelectric alarms in bedrooms and hallway, interconnected them and issued the CCEW.

Outcome

Compliant coverage across old and new sections, CCEW issued.

Approx. 2.3 hours on site

More on Smoke Alarms
Hot Water Systems

Off-peak hot water controller fault

House in Five Dock was getting cold showers after 8 am. We isolated the off-peak circuit, replaced the failed contactor in the meter box and confirmed the element and thermostat were healthy.

Outcome

Off-peak restored, hot water back on schedule, meter re-sealed.

Approx. 1.7 hours on site

More on Hot Water Systems
Hot Water Systems

Heat-pump changeover from electric storage

Owner in Rhodes replaced a failed 315 L storage tank with a Reclaim heat-pump. We ran the new dedicated circuit, decommissioned the off-peak feed and coordinated the plumber for changeover.

Outcome

Heat-pump wired, CCEW issued, up to 75% less power for hot water.

Approx. 3.5 hours on site

More on Hot Water Systems
Data & TV Points

TV point relocation and cable tidy

Living room in Canada Bay was re-arranged and the TV needed to move to the opposite wall. We chased a new outlet into the plaster, ran RG6 quad-shield to the roof antenna and installed a wall-plate.

Outcome

Clean single-outlet install, no visible cabling, full HD/UHF signal.

Approx. 1.8 hours on site

More on Data & TV Points
Data & TV Points

Cat6 data drops for a work-from-home study

Home office in Abbotsford needed hard-wired data for two desks. We ran Cat6 from the study back to the modem, terminated on RJ45 wall plates and tested to 1 Gbps.

Outcome

Two 1 Gbps data outlets, tidy runs in the ceiling, no wireless drops.

Approx. 3 hours on site

More on Data & TV Points
Commercial Fit-outs

Retail fitout — lighting, power and data

New tenancy in Drummoyne needed a full electrical fitout inside a two-week window. We handled lighting design, GPO layout, data drops, sub-board, emergency lighting and the exit signs.

Outcome

Fitout complete, CCEW and compliance certificates issued, opened on time.

Approx. 40 hours on site

More on Commercial Fit-outs
Switchboard Upgrades

Safety switch nuisance tripping fix

A home in Ashfield had one shared RCD covering the whole house, tripping every time two appliances ran together. We split the board into individually RCBO-protected circuits and left the mains fed by RCBO.

Outcome

Individually protected circuits, nuisance tripping gone.

Approx. 5 hours on site

More on Switchboard Upgrades
Switchboard Upgrades

Undersized board overloaded by a new split system

Adding a ducted air conditioner in Summer Hill overloaded the old fuse-based board. We upgraded to a modern enclosure with extra ways, added a dedicated RCBO circuit for the new unit and re-tested every circuit.

Outcome

New board with spare capacity, dedicated air conditioning circuit, CCEW issued.

Approx. 6 hours on site

More on Switchboard Upgrades
LED Downlights & Lighting

IC-rated downlights for a re-insulated ceiling

After a Haberfield home had its ceiling insulation topped up, the old downlights were no longer insulation-contact rated. We swapped every fitting for IC-rated LEDs safe to cover with insulation.

Outcome

Insulation-safe LEDs throughout, no fire-risk clearance gaps.

Approx. 4.3 hours on site

More on LED Downlights & Lighting
LED Downlights & Lighting

Under-cabinet LED strip for a kitchen benchtop

A kitchen renovation in Lidcombe wanted shadow-free benchtop lighting. We ran low-voltage LED strip under the overhead cabinets, hid the driver inside the pantry and wired it to the existing downlight switch.

Outcome

Even benchtop lighting, no visible wiring, single switch control.

Approx. 3 hours on site

More on LED Downlights & Lighting
EV Charger Installation

Three-phase fast charger for a townhouse

A new EV owner in Enfield wanted faster charging than single-phase could offer. We confirmed three-phase supply was available, ran a dedicated circuit with the correct RCBO and mounted an 11 kW charger in the carport.

Outcome

11 kW three-phase charging, CCEW issued, full charge overnight.

Approx. 4.7 hours on site

More on EV Charger Installation
EV Charger Installation

Second EV charger added for a two-car household

A Belfield household bought a second EV and needed a matching charger beside the first. We checked available switchboard capacity, added load management between both chargers and ran the new circuit.

Outcome

Two chargers sharing capacity safely, no board upgrade needed.

Approx. 4 hours on site

More on EV Charger Installation
Ceiling Fans

Fan-light combo replacing an old batten holder

A bedroom in Campsie only had a bare batten holder and no fan. We installed a fan-light combo on a proper ceiling brace, wired a separate fan and light control and patched the ceiling rose.

Outcome

Fan and light on separate switches, ceiling properly braced.

Approx. 2 hours on site

More on Ceiling Fans
Ceiling Fans

High-void fan with extension rod for a raked ceiling

A living room in Kingsgrove had a raked ceiling too high for a standard fan mount. We fitted an extended down-rod, confirmed blade clearance and wired a wall control within easy reach.

Outcome

Fan mounted safely at the right height, smooth wall control.

Approx. 2.5 hours on site

More on Ceiling Fans
Smoke Alarms

Pre-sale compliance alarm upgrade

Ahead of a sale in Earlwood, the vendor needed alarms brought up to current standard. We replaced ageing 9V units with interconnected 10-year lithium alarms in every required location and issued a compliance statement.

Outcome

Fully compliant alarms ahead of settlement, statement issued for the contract.

Approx. 2.2 hours on site

More on Smoke Alarms
Smoke Alarms

Rental compliance interconnection

A rental property in Canterbury had alarms that weren't interconnected, falling short of NSW rental rules. We hard-wired and interconnected alarms across every level so one trigger sounds them all.

Outcome

Rental-compliant interconnected alarms, landlord obligations met.

Approx. 2.5 hours on site

More on Smoke Alarms
Hot Water Systems

Continuous flow electric hot water circuit

A bathroom addition in Hurlstone Park needed power for a new continuous-flow electric hot water unit. We ran a dedicated high-amp circuit from the switchboard and installed the correct isolator at the unit.

Outcome

Dedicated circuit installed, continuous hot water, isolator compliant.

Approx. 3 hours on site

More on Hot Water Systems
Hot Water Systems

Storage tank thermostat replacement

Lukewarm water in a Dulwich Hill home traced back to a failed thermostat in the electric storage tank. We isolated the circuit, replaced the thermostat and element cutout, and confirmed safe operating temperature.

Outcome

Hot water restored, safe thermostat cut-out confirmed.

Approx. 1.5 hours on site

More on Hot Water Systems
Electrical Fault Finding

Intermittent power loss to a home office

A home office in Lewisham kept losing power for no obvious reason. We traced it to a loose neutral connection in a downstream junction box, re-terminated the joint and tested the circuit under load.

Outcome

Loose neutral re-terminated, power loss resolved.

Approx. 2.5 hours on site

More on Electrical Fault Finding
Electrical Fault Finding

Flickering lights traced to a shared neutral

Lights flickering across two rooms in Petersham pointed to a wiring fault. We traced a shared neutral between circuits back to the switchboard, separated the wiring and confirmed steady voltage on both.

Outcome

Shared neutral separated, flickering eliminated.

Approx. 2.8 hours on site

More on Electrical Fault Finding
Electrical Fault Finding

Tripping RCD isolated to an outdoor GPO

A safety switch in Newtown kept tripping whenever it rained. We isolated the fault to water ingress in an outdoor power point, replaced it with a weatherproof IP-rated unit and resealed the cable entry.

Outcome

Weatherproof GPO installed, RCD no longer trips in wet weather.

Approx. 1.8 hours on site

More on Electrical Fault Finding
Electrical Fault Finding

Buzzing switchboard traced to a failing breaker

An audible buzzing from the switchboard in Leichhardt was reported before it got worse. We found a breaker with a degraded internal contact, replaced it and thermal-imaged the board to rule out other hot spots.

Outcome

Faulty breaker replaced, board confirmed fault-free.

Approx. 2.2 hours on site

More on Electrical Fault Finding
Level 2 Electrical Services

Overhead service line replacement

A storm-damaged overhead line in Annandale needed an ASP-licensed replacement back to the pole. We coordinated the outage with the network operator, replaced the service line and restored supply the same day.

Outcome

Service line replaced, supply restored, network compliance signed off.

Approx. 4 hours on site

More on Level 2 Electrical Services
Level 2 Electrical Services

Underground consumer mains upgrade

A Rozelle home undergoing a renovation needed heavier underground mains to support the new load. We trenched in upgraded cabling from the pit to the meter box and coordinated final connection with Ausgrid.

Outcome

Upgraded mains capacity, network connection approved.

Approx. 7 hours on site

More on Level 2 Electrical Services
Level 2 Electrical Services

New supply run for a granny flat

A secondary dwelling in Balmain needed its own metered supply. We ran a new underground service from the main switchboard, installed a second meter and coordinated inspection with the network operator.

Outcome

Independent metered supply approved and connected.

Approx. 6 hours on site

More on Level 2 Electrical Services
Level 2 Electrical Services

Point of attachment repair after storm damage

High winds in Balmain East pulled the point of attachment away from the roofline. We repaired the mounting, restrung the service line to the correct tension and cleared it for reconnection.

Outcome

Attachment point repaired, service line reconnected safely.

Approx. 2.5 hours on site

More on Level 2 Electrical Services
CCTV & Security Systems

4-camera PoE system for a freestanding home

A family in Birchgrove wanted full coverage of their front, side and back yard. We ran shielded Cat6 to four PoE cameras, mounted an NVR in the garage and set up remote viewing on their phones.

Outcome

Four-camera coverage installed, remote viewing configured.

Approx. 5 hours on site

More on CCTV & Security Systems
CCTV & Security Systems

Driveway and entry camera upgrade

An ageing analogue camera at a Breakfast Point driveway was replaced with a modern PoE unit covering a wider angle. We re-used the existing cable run where possible and added a doorbell camera at the front entry.

Outcome

Wider driveway coverage, added entry camera, single app for both.

Approx. 3.3 hours on site

More on CCTV & Security Systems
CCTV & Security Systems

Warehouse perimeter camera install

A small warehouse in Cabarita needed perimeter coverage for after-hours security. We installed eight PoE cameras around the fence line and loading dock, wired back to a rack-mounted NVR with 30 days of storage.

Outcome

Full perimeter coverage, 30-day recording, remote alerts enabled.

Approx. 8 hours on site

More on CCTV & Security Systems
CCTV & Security Systems

Doorbell camera and NVR integration

A Chiswick homeowner wanted their existing cameras and a new doorbell camera on one system. We integrated the doorbell into the existing NVR, ran a dedicated PoE line to the front door and tested the combined recording.

Outcome

Doorbell and existing cameras unified on one recording system.

Approx. 2.7 hours on site

More on CCTV & Security Systems
Air Conditioning

Dedicated circuit for a new split system

A new split system in Liberty Grove needed its own protected circuit rather than sharing an existing GPO. We ran a dedicated RCBO circuit from the switchboard to an isolator beside the outdoor unit.

Outcome

Dedicated compliant circuit, isolator installed, unit commissioned.

Approx. 2.3 hours on site

More on Air Conditioning
Air Conditioning

Three-phase circuit for a ducted system

A whole-home ducted system in Mosman required three-phase power the existing board couldn't supply. We confirmed three-phase availability, upgraded the relevant switchboard section and ran the new circuit to the outdoor unit.

Outcome

Three-phase circuit installed, ducted system fully powered.

Approx. 5.3 hours on site

More on Air Conditioning
Air Conditioning

Isolator switch replacement for compliance

During a routine check in Cremorne, the outdoor isolator for a split system was found non-compliant and corroded. We replaced it with a weatherproof isolator rated for the unit and re-certified the installation.

Outcome

Compliant weatherproof isolator installed, unit re-certified.

Approx. 1.2 hours on site

More on Air Conditioning
Air Conditioning

Circuit upgrade for a multi-head split system

A Neutral Bay home adding a second indoor head to their multi-head system needed extra circuit capacity. We assessed the existing board, upgraded the circuit rating and confirmed both heads ran without tripping.

Outcome

Upgraded circuit supports both indoor heads without tripping.

Approx. 3.3 hours on site

More on Air Conditioning
Solar & Battery Systems

Battery retrofit to an existing solar array

A Cammeray home with an existing 6.6 kW solar system wanted battery storage added. We installed the battery beside the switchboard, wired in the hybrid inverter and configured backup circuits for essential loads.

Outcome

Battery storage added, backup circuits configured, self-consumption boosted.

Approx. 6.3 hours on site

More on Solar & Battery Systems
Solar & Battery Systems

New solar and battery installation

A newly built home in Kirribilli wanted solar and battery from day one. We installed rooftop panels, a hybrid inverter and battery, then commissioned the system with the retailer for feed-in approval.

Outcome

Solar and battery commissioned, feed-in approval granted.

Approx. 8 hours on site

More on Solar & Battery Systems
Solar & Battery Systems

Backup circuit board for blackout protection

After repeated outages in Milsons Point, a homeowner wanted key circuits to stay powered from their battery. We split off a backup board covering fridge, lighting and data, wired through the existing battery's backup output.

Outcome

Essential circuits protected during blackouts, verified with a test outage.

Approx. 3.7 hours on site

More on Solar & Battery Systems
Solar & Battery Systems

Solar inverter replacement and metering upgrade

A failed string inverter in North Sydney was replaced with a modern hybrid-ready unit. We updated the switchboard metering to suit, tested export limits and confirmed compliant reconnection to the grid.

Outcome

New inverter commissioned, metering updated, export limits confirmed.

Approx. 4 hours on site

More on Solar & Battery Systems
Switchboard Upgrades

Board upgrade before a kitchen renovation

A renovation in Crows Nest needed extra circuits for an induction cooktop, oven and dishwasher. We upgraded the board, added dedicated RCBO circuits for each appliance and left room on the din rail for future work.

Outcome

Three new appliance circuits, spare ways left for later, CCEW issued.

Approx. 5.3 hours on site

More on Switchboard Upgrades
LED Downlights & Lighting

Hallway and stairwell relight on sensors

A two-storey home in St Leonards had dark stairs and a gloomy hallway. We replaced the old fittings with wide-beam LEDs and added motion sensors so the stairwell lights itself at night without anyone hunting for a switch.

Outcome

Sensor-controlled stair and hall lighting, no more dark landings.

Approx. 3.2 hours on site

More on LED Downlights & Lighting
EV Charger Installation

Charger fed from the far side of the property

The driveway in Wollstonecraft sat well away from the switchboard. We trenched and ran conduit to the parking spot, sized the cable for the voltage drop and mounted a weatherproof charger on the garage wall.

Outcome

Long-run charger installed with correct cable sizing, CCEW issued.

Approx. 6.3 hours on site

More on EV Charger Installation
Ceiling Fans

Three fans installed in one visit

An owner in Waverton wanted fans in all three bedrooms before the hot weather hit. We checked the existing lighting circuit could carry them, braced each ceiling and installed matching DC fans with separate wall controls.

Outcome

Three DC fans on individual controls, all done in a single visit.

Approx. 4 hours on site

More on Ceiling Fans
Smoke Alarms

Annual compliance check for a managed rental

A property manager in Greenwich needed alarms tested and certified between tenancies. We tested every alarm, replaced two units past their 10-year expiry and issued a written compliance report for the file.

Outcome

All alarms tested and compliant, written report issued to the agent.

Approx. 1.2 hours on site

More on Smoke Alarms
Hot Water Systems

No hot water traced to a failed element

A household in Lane Cove lost hot water overnight. We tested the element and thermostat, found an open-circuit element, replaced both and checked the off-peak feed and earthing before refilling the tank.

Outcome

Element and thermostat replaced, hot water restored same day.

Approx. 2 hours on site

More on Hot Water Systems
Data & TV Points

Whole-home Wi-Fi fixed with a wired backhaul

Wi-Fi kept dropping at the back of a home in Longueville. We ran Cat6 to two ceiling access-point locations, powered them over Ethernet and set both to the same network so devices roam without dropping.

Outcome

Wired backhaul access points, full-strength Wi-Fi end to end.

Approx. 5 hours on site

More on Data & TV Points
Data & TV Points

Antenna and distribution amp for a unit

A unit in Riverview had a snowy picture on half the channels. We checked signal at the wall plate, replaced perished coax, re-terminated the F-connectors and fitted a masthead amp to lift the weaker multiplexes.

Outcome

All channels clean, signal levels measured and recorded.

Approx. 2.2 hours on site

More on Data & TV Points
Data & TV Points

Outdoor TV point for an entertaining area

An outdoor area in Hunters Hill needed a weatherproof TV point and power. We ran a new circuit, fitted an IP-rated GPO and TV outlet in a sealed enclosure and mounted the bracket to structural framing.

Outcome

Weatherproof outdoor TV point and power, ready for summer.

Approx. 3.3 hours on site

More on Data & TV Points
Commercial Fit-outs

Cafe fit-out with three-phase kitchen equipment

A new cafe in Woolwich needed power for a three-phase oven, grinders and cold room. We installed a sub-board, ran dedicated circuits for each machine and set up the exit and emergency lighting for sign-off.

Outcome

Kitchen powered, emergency lighting certified, opened on schedule.

Approx. 30 hours on site

More on Commercial Fit-outs
Commercial Fit-outs

Warehouse LED high-bay changeover

A warehouse in Huntleys Point was running old metal-halide high bays that took minutes to strike. We swapped them for LED high bays on the existing circuits, re-zoned the switching and added motion control to the racking aisles.

Outcome

Instant-on LED lighting, aisle motion control, big drop in lighting load.

Approx. 16 hours on site

More on Commercial Fit-outs
Commercial Fit-outs

Office data and power for 24 workstations

An office tenancy in Point Piper needed power and data at every desk. We installed floor boxes and in-desk outlets, ran Cat6 back to a new comms rack and labelled and tested every port.

Outcome

24 desks live with tested data and power, patch panel fully labelled.

Approx. 24 hours on site

More on Commercial Fit-outs
Commercial Fit-outs

Emergency and exit lighting compliance upgrade

A commercial building in Vaucluse failed its emergency lighting inspection. We replaced end-of-life fittings, corrected exit sign placement, completed the 90-minute discharge test and logged the results.

Outcome

Emergency lighting compliant, discharge test logged for the building file.

Approx. 10 hours on site

More on Commercial Fit-outs
Electrical Fault Finding

Intermittent trip traced to a garden light

An RCD in Watsons Bay tripped only after rain. We isolated circuits one at a time, insulation-tested each leg and found water in a garden light joint. We replaced the fitting and re-made the joint in a proper enclosure.

Outcome

Fault found and repaired, circuit insulation-tested clear.

Approx. 2.5 hours on site

More on Electrical Fault Finding
Level 2 Electrical Services

Consumer mains upgrade to 25 mm²

The service to a home in Rose Bay was undersized for a new air conditioner and EV charger. As an accredited Level 2 provider we arranged the disconnection, upgraded the consumer mains and re-connected and sealed the meter.

Outcome

Upgraded mains, capacity for future load, notification lodged.

Approx. 7 hours on site

More on Level 2 Electrical Services
CCTV & Security Systems

Four-camera system with mobile access

An owner in Bellevue Hill wanted eyes on the driveway and both side gates. We ran cabling from a discreet NVR position to four PoE cameras, aimed each for plate-readable coverage and set up phone alerts.

Outcome

Four PoE cameras recording locally, mobile alerts configured.

Approx. 7 hours on site

More on CCTV & Security Systems
Air Conditioning

Dedicated circuit for a new split system

A split system going into a home in Double Bay needed its own supply. We ran a dedicated RCBO circuit from the board, installed an isolator at the outdoor unit and tested the load under running conditions.

Outcome

Dedicated circuit and isolator installed, load tested, CCEW issued.

Approx. 3 hours on site

More on Air Conditioning
Solar & Battery Systems

Battery retrofit to an existing solar system

An older solar system in Woollahra was exporting most of its production for very little. We added a battery with a hybrid inverter, re-worked the switchboard connection and configured charging around the household's evening peak.

Outcome

Battery commissioned, evening usage now self-supplied.

Approx. 8 hours on site

More on Solar & Battery Systems
Empire Electrical Contractors Sydney team

Our Mission

At Empire Electrical Contractors, we're committed to being Sydney's most trusted emergency electrician - whatever the time, whatever the fault.

Our licensed team is equipped with the knowledge, tools and stocked vans to handle any emergency electrical job - from a tripping safety switch at 3am to a burnt switchboard that needs replacing today.

Call us 24/7 to speak with a real Sydney electrician. Clear recommendations and pricing provided before any repair work proceeds.