Sydney electriciancase studiesReal jobs, real outcomes
A snapshot of recent completed jobs across the Inner West and Canterbury-Bankstown — switchboards, EV chargers, LED relights, smoke alarms, hot water, data & TV and commercial fit-outs. Anonymised, but the work is real.
Free phone advice · Clear pricing provided before any repair work proceeds
24/7 callout · Real Sydney electrician, not a call centre
Switchboard Upgrades
Ceramic-fuse board swap on a 1970s brick veneer
Homeowner in Strathfield had breakers tripping every time the kettle and toaster ran together. We pulled the old board, installed a modern enclosure with individual RCBOs on every circuit and re-terminated the tails.
Outcome
New compliant board, CCEW issued, zero tripping since.
A terrace in Strathfield South had a warped, weather-damaged meter box on the front facade. We coordinated the Ausgrid outage, relocated the meter, upgraded the board and weatherproofed the new enclosure.
Outcome
Meter moved, board upgraded, heritage frontage preserved.
Owner in Homebush wanted 28 halogens replaced with dimmable LEDs before summer. We spec'd matched trailing-edge dimmers, swapped fittings room-by-room and left clean plaster cut-outs.
Outcome
28 LEDs installed, ~90% lighting energy saved, no flicker.
Kitchen renovation in Homebush West needed even task lighting over the island plus dimmable ambient. We laid out fittings on a 1.4 m² grid, installed pendants over the bench and wired a two-scene dimmer.
Outcome
Bright, even lighting, two dim scenes, no shadow zones.
New Tesla owner in Burwood needed a home charger. We ran a dedicated 32 A RCBO circuit from the switchboard, mounted the Wall Connector in the garage and configured load balancing so the main never trips.
Outcome
7 kW home charging, CCEW issued, ~40 km range per hour.
Homeowner in Croydon with a 6.6 kW rooftop array wanted to charge only from excess solar. We wired a Zappi charger, added the CT clamp on the mains, and configured Eco+ mode so the car sips only spare PV.
Outcome
Free daytime charging from surplus solar, app-managed schedules.
Family in Croydon Park needed a quiet fan in the main bedroom. We removed the existing rose, installed a DC fan on a rated bracket and wired a dedicated wall controller — no pull-cord dangling.
Outcome
DC fan installed, 6-speed wall control, near-silent running.
Alfresco area in Concord needed an outdoor-rated fan over the dining table. We ran a new outlet from a nearby circuit, sealed the ceiling penetration and installed an IP-rated fan with remote.
Outcome
Weatherproof fan, remote control, ready for summer.
Investment property in Concord West needed compliant interconnected alarms across three levels. We replaced ageing 9 V units with hard-wired 10-year lithium alarms interconnected via wireless mesh.
Outcome
AS 3786-compliant coverage, one alarm triggers all, ready for lease.
Extension in North Strathfield needed alarms tied to the new circuits. We hard-wired 240 V photoelectric alarms in bedrooms and hallway, interconnected them and issued the CCEW.
Outcome
Compliant coverage across old and new sections, CCEW issued.
House in Five Dock was getting cold showers after 8 am. We isolated the off-peak circuit, replaced the failed contactor in the meter box and confirmed the element and thermostat were healthy.
Outcome
Off-peak restored, hot water back on schedule, meter re-sealed.
Owner in Rhodes replaced a failed 315 L storage tank with a Reclaim heat-pump. We ran the new dedicated circuit, decommissioned the off-peak feed and coordinated the plumber for changeover.
Outcome
Heat-pump wired, CCEW issued, up to 75% less power for hot water.
Living room in Canada Bay was re-arranged and the TV needed to move to the opposite wall. We chased a new outlet into the plaster, ran RG6 quad-shield to the roof antenna and installed a wall-plate.
Outcome
Clean single-outlet install, no visible cabling, full HD/UHF signal.
Home office in Abbotsford needed hard-wired data for two desks. We ran Cat6 from the study back to the modem, terminated on RJ45 wall plates and tested to 1 Gbps.
Outcome
Two 1 Gbps data outlets, tidy runs in the ceiling, no wireless drops.
New tenancy in Drummoyne needed a full electrical fitout inside a two-week window. We handled lighting design, GPO layout, data drops, sub-board, emergency lighting and the exit signs.
Outcome
Fitout complete, CCEW and compliance certificates issued, opened on time.
A home in Ashfield had one shared RCD covering the whole house, tripping every time two appliances ran together. We split the board into individually RCBO-protected circuits and left the mains fed by RCBO.
Adding a ducted air conditioner in Summer Hill overloaded the old fuse-based board. We upgraded to a modern enclosure with extra ways, added a dedicated RCBO circuit for the new unit and re-tested every circuit.
Outcome
New board with spare capacity, dedicated air conditioning circuit, CCEW issued.
After a Haberfield home had its ceiling insulation topped up, the old downlights were no longer insulation-contact rated. We swapped every fitting for IC-rated LEDs safe to cover with insulation.
Outcome
Insulation-safe LEDs throughout, no fire-risk clearance gaps.
A kitchen renovation in Lidcombe wanted shadow-free benchtop lighting. We ran low-voltage LED strip under the overhead cabinets, hid the driver inside the pantry and wired it to the existing downlight switch.
Outcome
Even benchtop lighting, no visible wiring, single switch control.
A new EV owner in Enfield wanted faster charging than single-phase could offer. We confirmed three-phase supply was available, ran a dedicated circuit with the correct RCBO and mounted an 11 kW charger in the carport.
Outcome
11 kW three-phase charging, CCEW issued, full charge overnight.
A Belfield household bought a second EV and needed a matching charger beside the first. We checked available switchboard capacity, added load management between both chargers and ran the new circuit.
Outcome
Two chargers sharing capacity safely, no board upgrade needed.
A bedroom in Campsie only had a bare batten holder and no fan. We installed a fan-light combo on a proper ceiling brace, wired a separate fan and light control and patched the ceiling rose.
Outcome
Fan and light on separate switches, ceiling properly braced.
High-void fan with extension rod for a raked ceiling
A living room in Kingsgrove had a raked ceiling too high for a standard fan mount. We fitted an extended down-rod, confirmed blade clearance and wired a wall control within easy reach.
Outcome
Fan mounted safely at the right height, smooth wall control.
Ahead of a sale in Earlwood, the vendor needed alarms brought up to current standard. We replaced ageing 9V units with interconnected 10-year lithium alarms in every required location and issued a compliance statement.
Outcome
Fully compliant alarms ahead of settlement, statement issued for the contract.
A rental property in Canterbury had alarms that weren't interconnected, falling short of NSW rental rules. We hard-wired and interconnected alarms across every level so one trigger sounds them all.
A bathroom addition in Hurlstone Park needed power for a new continuous-flow electric hot water unit. We ran a dedicated high-amp circuit from the switchboard and installed the correct isolator at the unit.
Outcome
Dedicated circuit installed, continuous hot water, isolator compliant.
Lukewarm water in a Dulwich Hill home traced back to a failed thermostat in the electric storage tank. We isolated the circuit, replaced the thermostat and element cutout, and confirmed safe operating temperature.
Outcome
Hot water restored, safe thermostat cut-out confirmed.
A home office in Lewisham kept losing power for no obvious reason. We traced it to a loose neutral connection in a downstream junction box, re-terminated the joint and tested the circuit under load.
Lights flickering across two rooms in Petersham pointed to a wiring fault. We traced a shared neutral between circuits back to the switchboard, separated the wiring and confirmed steady voltage on both.
A safety switch in Newtown kept tripping whenever it rained. We isolated the fault to water ingress in an outdoor power point, replaced it with a weatherproof IP-rated unit and resealed the cable entry.
Outcome
Weatherproof GPO installed, RCD no longer trips in wet weather.
An audible buzzing from the switchboard in Leichhardt was reported before it got worse. We found a breaker with a degraded internal contact, replaced it and thermal-imaged the board to rule out other hot spots.
A storm-damaged overhead line in Annandale needed an ASP-licensed replacement back to the pole. We coordinated the outage with the network operator, replaced the service line and restored supply the same day.
Outcome
Service line replaced, supply restored, network compliance signed off.
A Rozelle home undergoing a renovation needed heavier underground mains to support the new load. We trenched in upgraded cabling from the pit to the meter box and coordinated final connection with Ausgrid.
A secondary dwelling in Balmain needed its own metered supply. We ran a new underground service from the main switchboard, installed a second meter and coordinated inspection with the network operator.
Outcome
Independent metered supply approved and connected.
High winds in Balmain East pulled the point of attachment away from the roofline. We repaired the mounting, restrung the service line to the correct tension and cleared it for reconnection.
Outcome
Attachment point repaired, service line reconnected safely.
A family in Birchgrove wanted full coverage of their front, side and back yard. We ran shielded Cat6 to four PoE cameras, mounted an NVR in the garage and set up remote viewing on their phones.
An ageing analogue camera at a Breakfast Point driveway was replaced with a modern PoE unit covering a wider angle. We re-used the existing cable run where possible and added a doorbell camera at the front entry.
Outcome
Wider driveway coverage, added entry camera, single app for both.
A small warehouse in Cabarita needed perimeter coverage for after-hours security. We installed eight PoE cameras around the fence line and loading dock, wired back to a rack-mounted NVR with 30 days of storage.
Outcome
Full perimeter coverage, 30-day recording, remote alerts enabled.
A Chiswick homeowner wanted their existing cameras and a new doorbell camera on one system. We integrated the doorbell into the existing NVR, ran a dedicated PoE line to the front door and tested the combined recording.
Outcome
Doorbell and existing cameras unified on one recording system.
A new split system in Liberty Grove needed its own protected circuit rather than sharing an existing GPO. We ran a dedicated RCBO circuit from the switchboard to an isolator beside the outdoor unit.
Outcome
Dedicated compliant circuit, isolator installed, unit commissioned.
A whole-home ducted system in Mosman required three-phase power the existing board couldn't supply. We confirmed three-phase availability, upgraded the relevant switchboard section and ran the new circuit to the outdoor unit.
Outcome
Three-phase circuit installed, ducted system fully powered.
During a routine check in Cremorne, the outdoor isolator for a split system was found non-compliant and corroded. We replaced it with a weatherproof isolator rated for the unit and re-certified the installation.
Outcome
Compliant weatherproof isolator installed, unit re-certified.
A Neutral Bay home adding a second indoor head to their multi-head system needed extra circuit capacity. We assessed the existing board, upgraded the circuit rating and confirmed both heads ran without tripping.
Outcome
Upgraded circuit supports both indoor heads without tripping.
A Cammeray home with an existing 6.6 kW solar system wanted battery storage added. We installed the battery beside the switchboard, wired in the hybrid inverter and configured backup circuits for essential loads.
A newly built home in Kirribilli wanted solar and battery from day one. We installed rooftop panels, a hybrid inverter and battery, then commissioned the system with the retailer for feed-in approval.
Outcome
Solar and battery commissioned, feed-in approval granted.
After repeated outages in Milsons Point, a homeowner wanted key circuits to stay powered from their battery. We split off a backup board covering fridge, lighting and data, wired through the existing battery's backup output.
Outcome
Essential circuits protected during blackouts, verified with a test outage.
A failed string inverter in North Sydney was replaced with a modern hybrid-ready unit. We updated the switchboard metering to suit, tested export limits and confirmed compliant reconnection to the grid.
Outcome
New inverter commissioned, metering updated, export limits confirmed.
A renovation in Crows Nest needed extra circuits for an induction cooktop, oven and dishwasher. We upgraded the board, added dedicated RCBO circuits for each appliance and left room on the din rail for future work.
Outcome
Three new appliance circuits, spare ways left for later, CCEW issued.
A two-storey home in St Leonards had dark stairs and a gloomy hallway. We replaced the old fittings with wide-beam LEDs and added motion sensors so the stairwell lights itself at night without anyone hunting for a switch.
Outcome
Sensor-controlled stair and hall lighting, no more dark landings.
The driveway in Wollstonecraft sat well away from the switchboard. We trenched and ran conduit to the parking spot, sized the cable for the voltage drop and mounted a weatherproof charger on the garage wall.
Outcome
Long-run charger installed with correct cable sizing, CCEW issued.
An owner in Waverton wanted fans in all three bedrooms before the hot weather hit. We checked the existing lighting circuit could carry them, braced each ceiling and installed matching DC fans with separate wall controls.
Outcome
Three DC fans on individual controls, all done in a single visit.
A property manager in Greenwich needed alarms tested and certified between tenancies. We tested every alarm, replaced two units past their 10-year expiry and issued a written compliance report for the file.
Outcome
All alarms tested and compliant, written report issued to the agent.
A household in Lane Cove lost hot water overnight. We tested the element and thermostat, found an open-circuit element, replaced both and checked the off-peak feed and earthing before refilling the tank.
Outcome
Element and thermostat replaced, hot water restored same day.
Wi-Fi kept dropping at the back of a home in Longueville. We ran Cat6 to two ceiling access-point locations, powered them over Ethernet and set both to the same network so devices roam without dropping.
Outcome
Wired backhaul access points, full-strength Wi-Fi end to end.
A unit in Riverview had a snowy picture on half the channels. We checked signal at the wall plate, replaced perished coax, re-terminated the F-connectors and fitted a masthead amp to lift the weaker multiplexes.
Outcome
All channels clean, signal levels measured and recorded.
An outdoor area in Hunters Hill needed a weatherproof TV point and power. We ran a new circuit, fitted an IP-rated GPO and TV outlet in a sealed enclosure and mounted the bracket to structural framing.
Outcome
Weatherproof outdoor TV point and power, ready for summer.
A new cafe in Woolwich needed power for a three-phase oven, grinders and cold room. We installed a sub-board, ran dedicated circuits for each machine and set up the exit and emergency lighting for sign-off.
Outcome
Kitchen powered, emergency lighting certified, opened on schedule.
A warehouse in Huntleys Point was running old metal-halide high bays that took minutes to strike. We swapped them for LED high bays on the existing circuits, re-zoned the switching and added motion control to the racking aisles.
Outcome
Instant-on LED lighting, aisle motion control, big drop in lighting load.
An office tenancy in Point Piper needed power and data at every desk. We installed floor boxes and in-desk outlets, ran Cat6 back to a new comms rack and labelled and tested every port.
Outcome
24 desks live with tested data and power, patch panel fully labelled.
A commercial building in Vaucluse failed its emergency lighting inspection. We replaced end-of-life fittings, corrected exit sign placement, completed the 90-minute discharge test and logged the results.
Outcome
Emergency lighting compliant, discharge test logged for the building file.
An RCD in Watsons Bay tripped only after rain. We isolated circuits one at a time, insulation-tested each leg and found water in a garden light joint. We replaced the fitting and re-made the joint in a proper enclosure.
Outcome
Fault found and repaired, circuit insulation-tested clear.
The service to a home in Rose Bay was undersized for a new air conditioner and EV charger. As an accredited Level 2 provider we arranged the disconnection, upgraded the consumer mains and re-connected and sealed the meter.
Outcome
Upgraded mains, capacity for future load, notification lodged.
An owner in Bellevue Hill wanted eyes on the driveway and both side gates. We ran cabling from a discreet NVR position to four PoE cameras, aimed each for plate-readable coverage and set up phone alerts.
Outcome
Four PoE cameras recording locally, mobile alerts configured.
A split system going into a home in Double Bay needed its own supply. We ran a dedicated RCBO circuit from the board, installed an isolator at the outdoor unit and tested the load under running conditions.
Outcome
Dedicated circuit and isolator installed, load tested, CCEW issued.
An older solar system in Woollahra was exporting most of its production for very little. We added a battery with a hybrid inverter, re-worked the switchboard connection and configured charging around the household's evening peak.
Outcome
Battery commissioned, evening usage now self-supplied.
At Empire Electrical Contractors, we're committed to being Sydney's most trusted emergency electrician - whatever the time, whatever the fault.
Our licensed team is equipped with the knowledge, tools and stocked vans to handle any emergency electrical job - from a tripping safety switch at 3am to a burnt switchboard that needs replacing today.
Call us 24/7 to speak with a real Sydney electrician. Clear recommendations and pricing provided before any repair work proceeds.