Level 2 Electrical Services Strathfield
Fixed price, done first visit
New service connection, meter upgrade or mains repair? Level 2 work must be done by an ASP-accredited electrician — that's us. We handle Ausgrid liaison, service lines and metering end to end. Serving Strathfield and the surrounding Inner West area.
NSW LICENSED|FULLY INSURED|LIFETIME WARRANTY
You're viewing Level 2 ASP in Strathfield
Need something else here? Jump to the full Strathfield services hub.
Get an emergency Strathfield electrician on the way
Free phone advice · Clear pricing provided before any repair work proceeds
Mains or meter work needs a different brief from a request to change a light or power point. For a Strathfield property, begin by describing the intended change: work around the meter position, a proposed mains upgrade or electrical planning associated with a larger renovation. Photographs of the existing arrangement can support the conversation without anyone opening supply equipment.
The building type also shapes the initial questions. A period house brings the existing route and frontage into view, while an apartment project needs a description of the building equipment involved. Make the purpose of the work explicit before seeking a scope, so meter work, mains work and unrelated internal alterations are not bundled into an unclear request with no defined starting point.
Frame the supply enquiry around the network
For Strathfield, the relevant electricity distributor is Ausgrid. Put that network context alongside the description of your proposed supply-side work, rather than treating the project as an ordinary internal circuit alteration. Include the intended outcome and any existing project documents when discussing the next step. The Level 2 guide provides an introduction to the kinds of work covered by this service. Use it to prepare questions about the mains and meter scope, then bring those questions back to the installation and proposed change at your address.

5 STAR RATING
What Sydney customers say
Jennifer Cornish
November 2025 · Google review
Exceptional Service - Highly Recommend! I contacted Joe from Empire Electrical to install new powerpoints and downlights. His professionalism, punctuality, and thoroughness stood out.
Shirish Shetty
June 2026 · Google review
Absolutely outstanding electrician and genuinely one of the best people to work with. He diagnosed and fixed the issue within a couple of hours. He was professional, efficient, and reliable.
Jie Z (Jessica)
June 2026 · Google review
VERY HIGHLY recommend! We had an issue with power at home and needed someone urgently to restore the electricity service. They responded quickly, showed up on time, and got everything back up and running without any hassle.
Vin J
March 2026 · Google review
I highly recommend Joe, he's very skilled, kind and does honest work. He did a massive last minute job for us, installing an entire 17.4kw ducted aircon system after our old unit broke.
Jasmin Cumming
July 2025 · Google review
I am so glad I called Empire Electrical. Joe is a very honest person which is hard to come by. He explained everything to me and charged me an incredibly fair price.
Noreen De Gracia
July 2025 · Google review
It was an extremely exceptional service from Joe! He came to replace my cooktop on my rented unit then went above and beyond liaising and explaining with my property manager.
Eric Lau
July 2024 · Google review
I recently had Joe fix two exhaust fans at my place, and I couldn't be more satisfied with the service. Joe showed up on time, explained everything clearly, and fixed the issues quickly.
Mains and meter planning for a period house
Broughton Road and Churchill Avenue include Federation housing groups. For mains or meter work at an older home, identify the existing meter position and the proposed route in photographs. Ask for the scope to distinguish alterations to the supply arrangement from other renovation wiring. The mains upgrade guide can help organise your questions before an assessment. Keep the building's architectural era as context rather than a diagnosis of the current mains, and provide any documentation from earlier electrical changes that you have available to discuss.

Apartment projects need a building description
Strathfield includes flats and apartments as well as separate houses and attached dwellings. For a proposed apartment-building mains or meter project, identify whether the enquiry concerns a particular unit's arrangement or a broader building alteration. Bring the building manager or strata contact into the scope discussion with plans or existing equipment information. A photograph of a unit interior does not explain the whole project. Describe the intended outcome and the equipment location so the conversation can address the building arrangement rather than assuming a house-style installation.

Keep the visible route in the heritage discussion
The Boulevarde Retail Conservation Area is part of Strathfield's heritage setting. If a mains or meter proposal affects a visible frontage, show the proposed equipment position and cable route in relation to the building. Ask for those visible elements to be discussed before settling the scope. A wide photograph helps explain how the installation would sit against the façade, while a separate equipment photograph can show the existing arrangement. Keeping both views in the brief makes the proposed physical change easier for the owner to consider.

FIXED PRICING
What you'll pay for level 2 asp
Every job is fixed-priced on site before we touch anything. No hourly meter, no call-out surprise.
Included in every fixed price
- ASP labour
- Consumer mains
- Point of attachment hardware
- Ausgrid paperwork
- CCEW
Every Level 2 ASP job, same 4 steps
Site assessment
We inspect the point of attachment, mains cable, meter box and switchboard, and confirm the scope Ausgrid will require.
Ausgrid paperwork
We lodge the Level 2 notification, contestable/non-contestable forms and metering coordinator paperwork on your behalf.
Planned outage & works
Power isolated at the network, service line/mains/metering replaced, POA re-terminated, and metering commissioned.
Reconnect and certify
Reconnection, Notification of Service Works submitted to Ausgrid, and full compliance paperwork issued to you.
Recent work across Sydney
Switchboard faults, urgent callouts, residential and commercial - handled by the same licensed team.
Empire teamSwitchboard faults
Empire teamUrgent callouts
Empire teamResidential work
Empire teamKitchen & appliance
Empire teamOn-site, on time
Empire teamUnderground mains
Empire teamFully stocked vans
Empire teamCommercial fit-outs
Empire team7 days a week
Empire teamCouncil & infrastructure
Empire teamSwitchboard faults
Empire teamUrgent callouts
Empire teamResidential work
Empire teamKitchen & appliance
Empire teamOn-site, on time
Empire teamUnderground mains
Empire teamFully stocked vans
Empire teamCommercial fit-outs
Empire team7 days a week
Empire teamCouncil & infrastructure
24/7 Emergency Response
Real Sydney electricians on stand-by - day, night, weekends and public holidays.
Call Now
Fully Licensed & Insured
NSW licensed electrical contractor with full public liability insurance.
Request Help
Upfront, Honest Pricing
Clear recommendations and pricing provided before any repair work proceeds.
Get a Callback
Lifetime Workmanship Warranty
If our workmanship ever fails, we come back and fix it. Free.
View warranty details
VOLTEX SPECIALIST
25-year RCBO, GPO & switch warranty
Plus 7-year replacement on Voltex internal & external lighting.
Empire Electrical in Strathfield
Empire Electrical Contractors bring licensed, insured emergency electricians to homes and businesses in Strathfield and across the surrounding Sydney area.
Local vans on the road around the clock in Strathfield for urgent power, switchboard and safety faults - typically on site within 30-90 minutes.
Same number, same fast response - 24 hours a day, 7 days a week.
Questions from Strathfield
What should I identify in an initial supply-side enquiry?+
Describe the planned change and provide existing project information that relates to the supply arrangement. Ausgrid is the network distributor relevant to this Strathfield enquiry, so that context belongs in the discussion. Keep the intended mains or meter outcome separate from internal renovation tasks, giving the project a defined purpose before the detailed electrical scope is developed.
Does the style of an older house determine its mains scope?+
The local Federation housing groups describe architecture, not the present condition or arrangement of the mains. Supply photographs of the meter location and explain the change you are considering. Any information about previous electrical alterations can support the discussion, but the proposed work should be framed around the actual installation rather than the age of the façade.
Who should join a discussion about apartment-building meter work?+
Include the building manager or strata contact and someone able to explain the intended project outcome. Apartment buildings form part of Strathfield's dwelling mix, so for mains or meter work, tell us about the building equipment involved, not just the room inside a unit. Bring available plans and identify the existing equipment location to give the discussion a concrete starting point.

Our Mission
At Empire Electrical Contractors, we're committed to getting a licensed electrician to you - whatever the time, whatever the fault.
Our licensed team is equipped with the knowledge, tools and stocked vans to handle any emergency electrical job - from a tripping safety switch at 3am to a burnt switchboard that needs replacing today.
Call us 24/7 to speak with a real Sydney electrician. Clear recommendations and pricing provided before any repair work proceeds.
